The cold weather has put a KABOSH to getting the pedestrian bridge anytime soon. The construction company needs a few days of warmer than below freezing temperatures to complete the concrete ramps on the east side and the west side of the bidge apron. The freezing temperatures are preventing the pour.
The other problem concerning the apron retaining wall leaning outwards has been corrected. The addition of some geotextile material has added strength and support to the structure.
So hopefully in the new year we should be able to use our new bridge !!!!!